Final
alignment as the concrete sets. |
|
|

T. Steele Construction on the job! None better! |
|
|

The basement walls are left alone to cure
for a few days. |
|

Rubberized waterproofing is glued to the sides
of the basement walls. |
|
|

Draininge tiles inside and outside the foundation
is the Hybrid Homes way. |
|
|

Another look at the waterproofing. |
|

Insulation placed under the concrete floor. |
|
|

Showing styro under the insulation. |
|
|

City water. |
|