Gallery One - Lakehurst Hyrbid

 


Drill truck came in first to install the geothermal loops.

 

The design called for on 5 holes, 150 feet deep.

 

The drill crew was great and the install went without a hitch.


The geothermal loops are in. Next it's time to excavate for the basement.

 

Brian and Tom working hard.

 

The Hybrid Home is built upon a super foundation, complete with drainage tiles inside and out.

Insulated foundation walls are an important part of the Hybrid Home.

 

The Polysteel ICF foundation blocks will eventually be filled with 8 inches of concrete.

 

Polysteel ICF is tornado proof, bug proof, sound resistant, and built to last 100 years at least!


next