Gallery One - Lakehurst Hyrbid
Drill truck came in first to install the geothermal loops.
The design called for on 5 holes, 150 feet deep.
The drill crew was great and the install went without a hitch.
The geothermal loops are in. Next it's time to excavate for the basement.
Brian and Tom working hard.
The Hybrid Home is built upon a super foundation, complete with drainage tiles inside and out.
Insulated foundation walls are an important part of the Hybrid Home.
The Polysteel ICF foundation blocks will eventually be filled with 8 inches of concrete.
Polysteel ICF is tornado proof, bug proof, sound resistant, and built to last 100 years at least!